Chris Chapman will begin installation of french drains (to prevent erosion) at the boat ramp Monday November 8. He estimates this will take 3-5 days (depending on timely delivery of the rocks). The ramp may be inaccessible at times during this period. Trying to balance access vs need to complete task before early winter rains begin.